Skip to content

Contractor estimate generator

Itemise labour, materials and job costs on a clean PDF estimate, then convert accepted jobs into an invoice.

Estimate details
Contractor
Prepared for
Items
  1. $0.00
Sales tax rates

Each item uses one of these; choose it on the item under "Sales tax". Sales tax depends on your state, county and city, so type the combined rate that applies to this sale.

  • Sales tax % used by 1 item

Also on each item's list, with no rate to set: No tax.

Notes and payment
Saved on this device (0)

Every estimate you download is kept here, in this browser only.

Clearing your browser's site data deletes these. Export a backup to keep a copy.

How to use Contractor estimate generator

  1. Enter business and client details. Fill in the Contractor and Prepared for fields, upload an optional logo, and enter the Job site / project reference.
  2. Itemise labour and materials. Add line items with quantities, unit prices, optional Details or Discount, and select or add tax rates under Add another rate.
  3. Set validity and terms. Confirm the EST- document number, Date, and Valid until date (defaulting to 30 days), then add variation rules in Terms.
  4. Export or convert the job. Pick your Colour and Paper size (A4 or US Letter), click Download PDF, or select Turn into an invoice once the client approves.

Everything you type stays in this browser on your device. Nothing is uploaded, and your saved details are never sent anywhere.

Itemising labour, materials, and job-site details

Clear line-by-line breakdowns prevent client misunderstandings before work begins on site. The Contractor and Prepared for blocks keep your trading details separate from the customer’s billing contact, while the Job site / project field records the exact work address.

Separating labour hours from material allowances

Listing skilled labour, subcontractor hours, equipment hire, and raw materials on separate lines makes your pricing transparent. When a homeowner or project manager compares bids, they can see whether a cost difference comes from material grade or estimated labour days.

Under the UK HMRC Construction Industry Scheme Guide, tax deductions for subcontractors apply to labour payments rather than the direct cost of materials. Keeping those lines distinct from the start also helps if you later need to issue UK Construction Industry Scheme invoices for verified contractor billing.

Applying local tax rates, discounts, and job references

Each line item supports its own tax selection, quantity, unit price, and optional line discount. If your trade requires a regional levy or split-rate structure, click Add another rate to define custom percentages locally.

Using the EST- prefix keeps preliminary costings clearly separated from tax invoices in your accounting folder. You can also expand Details on any row to specify SKU codes, timber grades, or fixture allowances without cluttering the main item title.

How does a contractor estimate differ from a fixed quote?

An estimate is a reasonable cost projection based on visible conditions, whereas a formal quote is a binding price offer for a fully specified scope. Explaining that distinction in writing protects both parties when renovations uncover hidden plumbing, rotten joists, or outdated wiring.

Under the UK Consumer Rights Act 2015 Section 49, traders must perform services with reasonable care and skill, and pricing must remain fair when no fixed sum was agreed upfront. Stating your assumptions and exclusions in Terms ensures clients understand how unforeseen site discoveries affect the final bill.

Attribute Contractor estimate Fixed-price quote
Legal commitment Non-binding good-faith projection Binding contract once accepted
Price adjustments Adjusts if hidden site work arises Locked unless a written variation is signed
Best use case Renovations, repairs, early planning Defined installations with exact measurements
Default validity 30 days (editable in Valid until) Fixed validity window before material repricing
Document prefix EST- (for example EST-0001) QUO- on a fixed-price quote generator

Converting an accepted estimate into a final invoice

Once a client reviews your PDF estimate and approves the job, you do not need to re-type line items or client addresses. Every generated estimate includes a direct handoff into your billing workflow.

Carrying over line items and client data in one click

After generating the document with Download PDF, click Turn into an invoice on the confirmation screen. The editor automatically copies the customer contact, line items, quantities, tax rates, and notes into a fresh INV- draft and opens the invoice view.

Before downloading the final invoice, update quantities to match actual hours worked and materials installed. Retaining both the original estimate and the final invoice aligns with the IRS Small Business Recordkeeping Guide for substantiating job income and deductible material expenses.

Managing supplier purchase orders and variation approvals

Large builds often require ordering custom windows, cabinetry, or electrical switchgear from wholesalers before site work starts. You can mirror your material lines into a structured supplier document to order project materials from suppliers without mix-ups.

If the client requests upgrades mid-project, add a new line item or issue a revised estimate with an incremented number before purchasing extra stock. Documenting every change order in writing prevents end-of-job payment disputes.

Local IndexedDB drafts, PDF styling, and backup exports

Sensitive trade markups, hourly labour rates, and private client addresses never leave your computer. The PDF is rendered inside a dedicated Web Worker in your browser tab with zero server communication.

Customising paper size, accent colour, and template drafts

Choose from 7 built-in Colour swatches (#111111 ink black, #1f4e79 navy blue, #1d6b4f forest green, #8a1c1c burgundy, #5b2a86 plum, #0f6e7a teal, and #9a5b00 amber) to match your company branding. Switch Paper between A4 (210 mm × 297 mm) and US Letter (216 mm × 279 mm) depending on your regional print standard, with ISO 8601 date formatting (YYYY-MM-DD) in JSON backups.

All calculations, tax totals, and PDF rendering execute with 0 bytes (0 KB) transmitted to external servers. When testing new estimate layouts or training office staff, you can generate sample scope text with the Lorem ipsum generator before entering live customer figures.

Tip: Click Export backup under Saved on this device once a week to save a .json copy of your estimates and client directory, because clearing browser site data removes local IndexedDB records.

Exporting JSON backups and protecting pricing privacy

Every estimate you download appears under Saved on this device, where you can Open, Copy to increment the EST- number, or Delete old jobs. The default validity period is set to 30 days from the issue date, though you can adjust Valid until to 7 or 14 days for volatile material markets.

Use Forget my business details on shared office computers to wipe your saved contractor profile immediately. Note that this tool formats operational estimates for convenience rather than certified legal or tax advice; confirm contract wording and regional tax rules with a qualified advisor.

Questions

How is a contractor estimate different from a fixed quote?

An estimate provides a good-faith projection of labour hours and material allowances based on visible site conditions, so final costs can adjust if hidden issues appear. A fixed quote commits to a binding price for a defined scope.

Can I turn an accepted estimate into an invoice automatically?

Yes. After clicking Download PDF, select Turn into an invoice on the result screen to copy the client details, line items, tax rates, and notes directly into the invoice editor with INV- numbering.

What should a contractor include in the estimate terms box?

State what the estimate excludes, such as structural repairs behind walls, hazardous waste disposal, or permit fees. Add a variation clause explaining that extra work requires written sign-off before proceeding.

How long should a construction estimate remain valid?

The editor defaults Valid until to 30 days from the issue date, which suits most residential and commercial trades. Shorten the window to 7 or 14 days when lumber, copper, or fuel prices are volatile.

How do I separate labour and materials for tax reporting?

Create distinct line items for trade labour hours and physical materials, or note the breakdown in each line's Details field. Separating those figures simplifies regional reporting such as UK CIS deductions or local sales tax exemptions.

Where are my saved contractor estimates and rates stored?

Every estimate, client record, and business profile stays inside your browser's local IndexedDB storage on your own device. Use Export backup under Saved on this device to save a portable .json archive.

Updated